Partner Login
06421 8007-0

logo de DE

For an orchard irrigation in the Jordanian province of Al Mafraq, a TRIC Flex four PV system with an electrical output of 220 kWp was installed near the Syrian border. The power generated by the solar system is used for watering a fruit plantation. The greenfield system was installed on concrete foundations by Al Manakh Renewable Energy (Irbid) in spring 2018.

Plant data

Planning and implementation: Al Manakh Renewable Energy - www.manakhjo.com

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies).

You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.

Ok